GridStar® Flow to demonstrate military grid resilience and drive future solutionsAndover, Mass., June 14, 2022 – Lockheed Martin (NYSE: LMT) has been awarded a contract to build the first megawatt-scale, long-duration energy storage system for the U.S. Department of Defense (DoD). GridStar® Flow will be installed at Fort Carson, Colorado for the U.S. Army under the management of the U.S. Army Engineer Research and Development Center’s (ERDC) Construction Engineering Research Laboratory (CERL).
GridStar Flow is an innovative redox flow battery designed for large-capacity storage applications that stores power generated from renewable energy sources and dispatches it to electric grids during peak demand or unanticipated electricity loss.
Lockheed Martin’s first customer-sited production system is intended as a demonstration unit for the Army and ERDC-CERL. This system will be…
